Installation

ISRAR conduct a detailed construction plan to ensure potential roadblocks are resolved and all host requirements are accommodated.

Installation

Overview

ISRAR conduct a detailed construction plan to ensure potential roadblocks are resolved and all host requirements are accommodated. Starting with the engineering and construction phase, the project team keeps a rigorous deliverable schedule which includes a detailed, project-specific checklist. By placing special emphasis on the engineering and construction phase of each project, we maintain a clear channel of communication with installation teams. In the construction planning phase, the project team coordinates logistics to ensure such concerns as materials security, project oversight, and regularly scheduled status meetings are addressed.

We provide complete and comprehensive system testing at every step of the installation process. This commitment to quality means the testing phase is rigorous and thorough. The team ensures the following matters:

  • The system has been constructed according to plan and abides by all building code requirements.
  • All system components, including inverter operation, module and string voltages, combiner boxes, disconnects, grounding, and monitoring systems, are fully tested.
  • The entire system is then re-tested “end-to-end” to ensure it is performing to its maximum potential.
  • Upon final installation, the team makes sure all technical and warranty documentation is provided and eliminates the need for the end-of-project paper chase.