Studies

ISRAR offers high-standard studies for renewable energy projects based on Jordanian standards, codes as well as EN codes for the purpose of complying with local laws and regulations.

Studies

Key features

  • Topographic study
  • Geotechnical study
  • ESIA (Environmental & Social Impact Assessment)
  • GIS (Grid Impact study)
  • Hydrology Study
  • Grid Grounding Study
  • Lightning Protection Study
  • Local Security study report and security system design

Overview

ISRAR offers high-standard studies for renewable energy projects based on Jordanian standards, codes as well as EN codes for the purpose of complying with local laws and regulations.

  • Topographic study: Topographical surveys, reports, and drawings as per standards and norms.
  • Geotechnical study: Surveys and reports as per standards and norms.
  • ESIA (Environmental & Social Impact Assessment): Predicting and assessing the potential environmental and social impacts for proposed renewable projects and getting Ministry of Environment (MOE) approval.
  • GIS (Grid Impact study): Conducting a study of impact in capacity and load of the main grid when being connected to a source of renewable energy and getting NEPCO approval.
  • Hydrology Study: Complete design and engineering drawings for drainage solution and internal cross channel including cross sections and technical report and BOQ as per codes and norms.
  • Grid Grounding Study: Analyzing project under fault conditions to determine whether hazardous voltages will develop. The result of this study will determine the needed safety precautions and measures that must be taken.
  • Lightning Protection Study: Examine transient over-voltages that may result from lightning and suggest solutions, it is done based on Jordanian code and EN 62305-2.
  • Local Security study report and security system design: The complete design and engineering drawings for security and monitoring system and BOQ as per codes and norms.